Bonners Ferry High School Bleacher Replacement

The old bleachers were likely built by the Idaho National Guard when they were in Bonners Ferry in the 1960s. Since then, the bleachers have been repainted and updated. A grandstand and a sound system have also been added.

Over the years, repairs were made to the concession stands, ticket booth, and restrooms. In the summer of 2022, the old concession stand for football and track, built in the 1970s, was updated.

After many years of use, a new grandstand was needed because the old stadium was unstable and not compliant with ADA standards. The new grandstands meet ADA requirements and include ramps for easier access to seating. A paved walkway will also be built from the ticket booth to the grandstand.